Sewage plant at the Emscher in Bottrop Welheim
Built at: Oct.22.2001
Last update: Dezember 06, 2004
|
|
|
|
 |
Diese Seite ist auch in Deutsch
verfügbar. |
The reorganization of the Emscher belongs to the greatest
projects of the international building exhibition (IBA) in the
Ruhr district. Grass verges shall integrate the municipal parks,
nature protectorates and industry fallow into a network along
today's sewers to an "Emscher park" within some years.
Not only animals and plants but primarily the people then shall
reconquer the no man's land. With billion effort the 80
kilometers long, biologically dead sewer is changed back to a
river "the blue Emscher".
 |
|
 |
|
The making of the sewage
plant Bottrop is, with an estimated investment sum of 570
million DM, the greatest single project in the context of
the Emscher reorganization. The plant was built from 1991
to 1996 on the area of the earlier sewage plant in
Bottrop-Welheim. The catchment area contains the drainage
areas of the "Boye, the Schwarzbach, Lanferbach,
Holz-, Resser- and Sellmannsbach" with altogether
240 km2 and 648.000 inhabitants as well as numerous
industrials in the area of the cities Bottrop, Bochum,
Essen, Gelsenkirchen and Gladbeck. |
The
digestion towers of the sewage plant are 50m high and
with her egg-form they give an impressive looking.
Bottrop Welheim, Oct.21.2001
Camera: SONY DSC-F505 Cyber-shot, 1600 x 1200 fine
|
|
Information
panels give information about technical plantdata.
Bottrop Welheim, Oct.21.2001
Camera: SONY DSC-F505 Cyber-shot, 1600 x 1200 fine
|
|
 |
|
 |
|
 |
| |
In the four, 50 m of high digestion towers
of the sewage plant the sludge rots at approx.
36 centigrades for 20 days.
Bottrop Welheim, Oct.21.2001
Kite: Flow-Form # 2
Windspeed: approx. 3 - 7m/s, very gusty
Camera: SONY DSC-F505 Cyber-shot,
1600 x 1200 fine |
|
From
the air you can have an overlook
to a big part of the plant.
Bottrop Welheim, Oct.21.2001
Kite: Flow-Form # 2
Windspeed: approx. 3 - 7m/s, very gusty
Camera: SONY DSC-F505 Cyber-shot,
1600 x 1200 fine |
| |
|
|
|
|
Data of the sewage plant:
Capacity: 1.34 million inhabitant results (sewages of
approx. 650.000 inhabitants and an approximately equally
big set to industry sewage)
Area of the sewage plant: 187.000 m2
Dry weather influx: 4.25 m3/sec
Total area of the before-, revival-and after-clarification
basin: 58.000 m2
For place reasons exceptionally deep revival basins (10
meters) are required. The sewage flows through the plant
within approx. 9.5 hours. |
| Next to the fenced area of the sewage
plant there is a way with a little hill. Here I have
started my kite to make some aerial photos of the sewage
plant. Although the hill isn't very high, I clearly
noticed the turbulences in the air at low altitudes. |
 |
|
 |
| |
Clarification
basin and the little hill from the air.
Bottrop Welheim, Oct.21.2001
Kite: Flow-Form # 2
Windspeed: approx. 3 - 7m/s, very gusty
Camera: SONY DSC-F505 Cyber-shot,
1600 x 1200 fine
|
Links to other KAPers and more you can find in my Surfers
Guide.
I like to be available for questions, suggestions or experience exchange.
I would be very pleased about an entry in my visitor's
book.
Manfred